Masuk untuk akses cepat ke penawaran terbaik. Klik disini jika Anda tidak punyak akun.

Electrical Inspector Purna-Waktu Job

1 tahun yang lalu Teknik Tanjung - Kalimantan Selatan 794 views
Detil Pekerjaan

Available Position : 1

Employment Status : Contract
Work Location : Tanjung - Tabalong, South Kalimantan

Job Responsibilities:

  • Responsible for monitoring and coordinating subcontractor performance on the construction of the power plant project’s electrical facilities and other common electrical facilities to ensure that construction is done as according to specification, design, and schedule as well as to support the electrical engineering construction for auxiliary power. 
  • Monitor subcontractor’s performance on the construction of the power plant’s Electrical facilities to ensure that construction is done according to design and provide back up for voltage facilities management if needed.
  • Identify instrumentation and electrical design issues during the construction of the power plant’s Electrical facilities and to recommend and coordinate action plans to ensure corrective action is taken.
  • Monitor and report subcontractor’s construction progress for the power plant’s Electrical facilities to ensure construction is done on the schedule and to recommend corrective actions for any instrumentation, control, and electrical engineering issues.
  • Identify potential cost-effective equipment modification that has the potential to improve performance, reliability and safety.
  • Coordinate and monitor the implementation of instructions regarding the construction of the power plant’s Electrical facilities from Electrical team leader and C&I and E Engineering Manager to ensure construction is done as according to the agreed design.
  • Coordinate subcontractor activities regarding the construction of Electrical facilities for the power plant and to monitor the progress and performance of the subcontractors to ensure that the power plant’s Electrical facilities is constructed on schedule and on spec.

Job Requirements:

  • Minimum Diploma Degree (D3) graduate majoring in Electrical Engineering from reputable University, min GPA 3.00
  • Have 3-5 years’ experience in electrical engineering project (project construction or plant maintenance) preferably in power plant projects.
  • Good competencies on electrical engineering, project management, technology design, and systems analysis.
  • Good command in English both verbal and written
  • Willing to be on contractual basis during the project
  • Willing to be located at Tanjung – Tabalong, South Kalimantan

Exp date 30 September 2017


Informasi dari website lowongan kerja
Deskripsi Perusahaan
PT Tanjung Power Indonesia (TPI) is a consortium of AP (65%) and PT East-West Power Indonesia (35%), a subsidiary of Korea East-West Power Co Ltd., to build and operate a 2x100MW coal-fired power plant in the Tabalong Regency, South Kalimantan.
The total project cost is estimated to be US$545 million and TPI has closed financing and received commitments of US$422 million (including a contingency facility of US$13 million) from the Korea Development Bank, The Bank of Tokyo-Mitsubishi UFJ, Ltd., DBS Bank Ltd., Mizuho Bank Ltd., Sumitomo Mitsui Banking Corporation, and The Hong Kong and Shanghai Banking Corporation Limited. The financing was done on a project finance basis with KSURE providing comprehensive cover of approximately US$400 million.
This project will sell electricity to PLN under a PPA for 25 years from the Commercial Operation Date. TPI started construction in June 2016, six months before reaching Financing Close, by using shareholder funds, demonstrating our strong commitment to the success of the Government 35GW program. Construction is progressing on schedule, with both units expected to reach Commercial Operation in the first half of 2019. When fully operational, the plant will consume up to 1 Mt of coal per annum and AI will provide the coal for the plant.
The Government of Indonesia, through the Ministry of Finance, provides a Government guarantee to this project in the form of a Business Viability Guarantee Letter, under which the Government guarantees PLN’s ability to fulfil its payment obligations as stipulated in the PPA.
The power plant will use CFB technology which reduces nitrous oxide emissions due to its low combustion temperature. It will also use bag filters to eliminate ash emissions. The EPC contractor for the project is Hyundai Engineering Co Ltd. Operation and maintenance of the power plant will be by TPI.